EVM8
MECHANICAL PUMPS EVM8
-
Energy saving
-
Capacity dry running
-
Available PP – PVDF
Attacks:
- Rigid duct
- flexible piping
- Flanged
Specification and technical data
EVM12
MECHANICAL PUMPS EVM12
-
Energy saving
-
Capacity dry running
-
Available PP – PVDF
Attacks:
- Rigid duct
- flexible piping
- Flanged
Specification and technical data
EVM15
MECHANICAL PUMPS EVM15
-
Energy saving
-
Capacity dry running
-
Available PP – PVDF
Attacks:
- Rigid duct
- flexible piping
- Flanged
Specification and technical data
















